Design & Engineering Projects
EQ-House Design & Engineering Projects provide our clients an expert level of support producing competent and informative E-House design solutions
Service Category: |
Design & Engineering |
Scope |
Design & Engineering where natural ventilation has been specified for HV equipment. Strict focus on the flow of air to comply with the HVAC (Natural Ventilation) Requirements. |
1.) Région A Build (45 m/s)
2.) The building is 24532mm long x 4312 wide single lift and no split (Dimensions Incl landings)
90mm Stud Wall design with 380PFC Long and Cross members
3.) Included in build is Switch Room with external bolt-on landings.
4.) Cable trays over equipment
6.) Split Systems HVAC
Service Category: |
Design & Engineering |
Scope |
Design & Engineering where the building cable reticulation was unique due to the back to back panel configuration. |
1.) Région A Build(45 m/s) for Transgrid / Zinfra
2.) The building is 14588mm long x 3788 wide single lift and no split (Dimensions Incl landings)
75mm Stud Wall design with 250PFC Long and Cross members
3.) Included in build is Switch Room with external integrated landings and roof cover one end.
4.) Cable trays over equipment
6.) Under Ceiling HVAC Systems
Service Category: |
Design & Engineering |
Scope |
Design & Engineering for high dust and sand conditions – strict focus on the buildings IP rating. |
1.) Région A Build(45 m/s) for AngloGold Boston Shaker Mine
2.) The building is 23679mm long x 6419 wide single lift and no split (Dimensions Incl landings)
portal design with C100-19L wall & Roof Purlins
3.) Included in build is pressurization fan, E-house with external integrated landings.
4.) Cable trays on support columns and in the base frame
6.) Daikin 9.5Kw Split System
Service Category: |
Design & Engineering |
Scope |
Designed for cyclonic conditions. Lightweight steel was specified which required a unique approach to the design of the e-house bracing. |
1.) Région D(88 m/s) Build for RAAF
2.) The building is 14400mm long x 5346 wide single lift and no split (Dimensions Incl landings)
portal braced design with C100-19L wall & C150-24L Roof Purlins
3.) Included in build is pressurization fan, E-house with external integrated landings.
4.) Cable trays on support columns and in the base frame
6.) John Castle 14Kw Under Ceiling HVAC Systems
Service Category: |
Design & Engineering |
Scope |
Designed for cyclonic conditions. Lightweight steel was specified which required a unique approach to the design of the e-house bracing. |
1.) Region D(88 m/s) Build for RAAF
2.) The building is 9000mm long x 4000 wide single lift and no split (Dimensions Incl landings)
portal braced design with C100-19L wall & C150-24L Roof Purlins
3.) Included in build is pressurization fan, E-house with external integrated landings.
4.) Cable trays in the base frame
6.) Daikin 5Kw Split Systems
Service Category: |
Design & Engineering |
Scope |
Design & Engineering of the 1st consolidated solution – combining a Laboratory, Control Room & an E-House |
1.) Région A(45 m/s) Build for BHP Venus Plant
2.) The building is 20239mm long x 4332 wide single lift and no split (Dimensions Incl landings)
3.) Included in build is pressurization fan, E-house, Lunchroom with WC, Lab & Control Room in one building, with external landings with workbenches and Lockers. Portal design with C100-19L wall & Roof Purlins.
4.) FM200 Fire suppression
5.) Support Column Cable trays & in the base frame
6.) Control Room windows
7.) Daikin 9.5Kw Split Systems
Our client has engaged EQ-House to Design and Engineer Battery Housing Containers that will be manufactured in China and transport to Victoria – Australia to a Solar Farm.
EQ-House were engaged based on expertise to create a design that was strictly compliant to all Australian Standards:
Project: |
Service Category: |
Design & Engineering |
Scope: |
Design and Engineering a Bespoke Battery Housing Container |
EQ-House Client needed some expertise in E-Houses to help guide its people and their client in the specification and design of E-Houses. The design was contracted to be executed by the clients designers who had no experience in E-House design.
EQ-House liaised with its clients, architects, Structural engineers, HVAC system Engineers, fire services and electrical systems design engineers to help produce a coordinated functional outcome.
The original scope was 4 weeks, the value contributed has seen the scope expanded appreciably. EQ-House has been working on the project in the expert advice capacity now for over 12 months.
Additional scope included:
Project: |
North West Rail Link NWRL Sydney Australia |
Service Category: |
Design & Engineering |
Scope: |
Assist in optimizing the designs, writing specifications and Resolving technical issues |