Find the missing link between Design and Construction Management

The success or failure of a stress free e-house build can be closely linked to the communication channels that exist prior to any manufacturing taking place.  We see all too often where the essential link in the e-house process matrix has either been avoided altogether or not communicated properly between all stakeholders.  Overlooking the importance of the ‘process’ of the design optimisation in performing a detailed handover between Sales, Project Execution and Design needs to have a higher level of importance placed on it.

In a growing market where competition is fierce our Clients are continuously searching for a better way to manage projects and their profitability.  Creating a strategic link between all of your internal stakeholders will better provide successful outcomes.

In any equipment room  project, even at bid stage, the intrinsic link between the Design Manager and the Construction Manager is fundamental in producing not only an optimized design solution but more importantly one that actually has:

  • Obvious Constructibility
  • Links to a logical Schedule
  • Realistic interfaces between the E-House built structure and the building services

To assure you of success the EQ-House team have well resolved:

  • E-House design checklists
  • Precise client KOM templates
  • High-level e-house construction schedules
  • Detailed Handover templates linked between – Sales, Execution & Design
  • A Clearly defined Design Freeze that identifies the client’s needs and dictates the building design

The reflective success of these steps is what we call the 80-20 rule, 80% of design change is captured and agreed before execution commences.  Not the other way around which we, unfortunately, see quite often. Our team is here to act as the extended workbench to all of your equipment room projects.  

Our experience expands to include industries such as rail, mining, infrastructure and oil and gas, so let us support your team to deliver a successful project and achieve results that allow your team to collaborate as one.

With offices throughout Australia and Singapore we can assist globally for all your equipment house and switchroom requirements.  Contact us to find out more

Speak to an expert

For Expert Tendering Support EQ-House provide sales and estimating support  to ensure that all requirements for your tender submission are fulfilled and compliant.

For Expert Design & Engineering Our team are able to provide efficient, competent and informed E-House designs using 3D BIM design tools.

For Expert Vendor Audits & Inspections Our clients look to us too apply our Equipment House / Switchroom expertise to review vendors and materials suppliers at various stages before and during manufacture.

For Expert Project Audits & Inspections EQ-house investigate and propose solutions to improve productivity and quality to reduce lead times and mitigate cost.

For Expert Construction Management & Supervision Our experience allows us to recognise potential issues early, refute unreasonable variation claims and define solutions to navigate around problems to keep a project moving.

For Expert Equipment Install, Test & Commissioning EQ-House can provide the supervision & QC processes to ensure that all aspects of the equipment install is managed to minimise impact to your schedule and is compliant to your project / installation requirements.

Call 1300 360 545 or email

admin@eq-house.com

Share this article: