E-House Design Phase Completion – “For Construction Set”
By now all of the hard work should be done. The Sales Set submitted and the Tender set successfully across the line to win the next E-House or Switchroom project.
From this pint, the “For Construction set” should be a walk in the park. The critical factors to manage are the changes in design leading up to Design Freeze stage. This stage is vital to managing your clients expectations for change based on the inputs provided during the creation of the Tender Set of drawings.
Manufacturing experience for the E-House and Switchroom determines where design change should take place. In this instance, the 80/20 rule applies. 80% of change should take place in the period leading up to Design Freeze. Once construction has commenced the “For Construction Set” should only have a potential change of 20%. More often than not we see that it is the other way around.
The EQ-House team understand the design fundamentals required to produce a “For Construction Set” that eliminates the need for reproducing shop drawings.
Within the “For Construction Set” the level of detail provided takes into account:
- Structural Beam Line Requirements
- All Technical Provisions and Building Specifications
- Detailed Design Building Layouts, Elevations, and Sections
- Detailed BOM’s and Parts Lists
- Detailed Fixing Systems
- All Building Services and Integration
Our produced and optimised EQ-House “For Construction Set” is ready for manufacture.
We have the team and confidence that can produce a drawing set of under 100 designs that gives you all of the detail required to complete a successful construction.
Additionally at tender we can assist with optimisation that appreciably reduces the cost of a building. EQ-House solutions include preparing market estimates quickly that save you from having to go to market.
The estimates produce a detailed inclusions list and can be easily adapted for changes and white labelled.
You’ve managed change and now it’s time to Build!